aka GHP&W 5
You saw the tug Cornell moving Clearwater to the Rondout in this post in late October. But if you wondered how the Maine-built sloop was loaded, today’s your lucky day. First, the truck comes to deliver the wood to support the keel on the barge before the
Travelift moves Clearwater. Along the left side of the photo, that’s Norman’s Kill near where it flows into the Hudson.
When the blocking is ready, the Travelift moves down the tracks alongside the “pit”
and final adjustments are made.
Jacks provide stability. Note the large green building in the background; that’s Scarano Boat Building, where the Manhattans and many other vessels have been built.
Click here to see the 3m31 sec YouTube of the process of getting the loaded barge out of the pit for the southbound trip to the Rondout.
Many thanks to Paul Strubeck for these.
1 comment
Comments feed for this article
November 5, 2015 at 2:11 pm
GP Cox
Beautiful!!