The photo below I took on October 14, 2017 from the O-7 lock chamber, looking toward O-6.  Notice the red tug in the distance along the right side wall, which is the Leto Island side.

Here’s a close-up of the tug.

Below is a photo I took on March 24, 2018 from a cofferdam built where the tug above was, looking back toward Lock O-7.

Yes, the canal bed there is dry enough.  Who knows what besides bicycles lie in the mud . . .  guns, cell phones, flung away wedding rings . . .

 

The green bridge beyond lock O-7 is Utica Street.  All the compromised concrete of O-7 has been removed and

form and rebar installed.

Note the blue lift-basket in the photo below and use it as a reference in the following photos.

x

My position in the photo below is less than 30′ from the initial photo in this post.

These are the mitre gates at the top (south) side of O-7

And here’s that same tug Endeavor we saw above.  Now the pressures . . .?  Think of all the work that needs to be done by opening day in the NYS Canal system!  Crews here were working hard, and I was there on a Saturday, but opening day in less than 50 (??) days away.

All photos and sentiments by Will Van Dorp.  These locks are within Oswego city limits, right along East River Road, aka 481.