Here was 1 and here, 2. As others of you, I’ve been waiting for the walkway to open; it’s been closed since August 2013!!
Today’s photos are all from the past six weeks, and my way of saying that workers are still active on this bridge
See the same guys above and below?
My son works in a fairly high “man basket,” but I doubt he’s ever
been in one this high. These must extend to nearly 200′?
The next two photos I took earlier this week.
Since the Bayonne Bridge has appeared on every blog post (as header photo) I’ve done, I do know it better than any other bridge locally. Happy holidays from Will Van Dorp.
7 comments
Comments feed for this article
April 19, 2019 at 11:11 am
bowsprite
yikes. And the winds have been a-whipping!
April 19, 2019 at 6:21 pm
Charles Danko
When i was a youngster (1955 & such) we used to ride our bikes over to Staten Island from Bayonne. Had a lunch Mom packed……….no cell phones back then so no way to be reached. As long as we all got back home for dinner all was well with the world. Times have changed me thinks.
April 20, 2019 at 8:06 am
tugster
Those were the days, my friend; we thought they’d never end . . . .
April 19, 2019 at 11:46 pm
Phil Little
So..does anyone know when the new walk/bikeway will be open? I am so looking forward to doing my next “Great Loop” from Weehawken via the Bayonne and GWB!
April 20, 2019 at 8:07 am
tugster
When I hear, Phil, I will let you know!
May 24, 2019 at 2:43 pm
tugster
Hear ye hear ye . . . the pedestrian walkway is OPEN!!!
July 28, 2019 at 11:54 am
Phil Little
Hallelujah, Hallelujah and it shall be ridden! And it shall be an an elevating and inspirational experience to the multitudes!
And Lo: I have ridden to the very summit, and it is indeed…..one heck of a place to view harbor traffic!