The first six photo here comes from Jonathan Steinman, taken on June 13. The Donjon tugs has delivered Chesapeake 1000 to a point just off Rockefeller University’s campus to prepare for lifting prefabricated modules for Rockefeller’s River Campus.
Step one for Donjon is to secure the gargantuan crane.
Then Atlantic Salvor moves into place to
receive the massive anchors, a job that Salvor may be IS uniquely qualified to perform.
The yellow lighted buoys mark the anchors’ positions.
By the time I got there on June 17, sans camera other than phone, several of the modules had already been lifted from the waterborne transport into the locations where they’ll stay for a very long time. See time lapse of the installation of modules 1 and 2 on youtube here.
A dozen more modules will still be lifted when
water, tidal, and atmospheric conditions allow.
Click here for more information of the River Campus project, one of many construction sights to behold along the East over. A calendar of additional lifting can be found here, subject to change.
And many thanks to Jonathan for use of his photos and information about the project. Next time, I’ll bring my good camera.
Previous sights to behold there can be found here.
And while we’re on the topic of heavy equipment, here’s a vimeo update of of invisible gold project happening off Block Island. I want to get back there soon.